Solar PV designed to match your consumption, not a catalogue.

Turnkey solar PV power plants for residential homes and businesses. We analyse your utility bills, survey your roof, and design the panels and battery storage so that the electricity generated is actually consumed on-site. We handle grid connection, installation, inspection, and all documentation required for Nová zelená úsporám.

Free consumption analysisfrom the annual electricity bill
Design within 3 working days. Panels, inverter and battery tailored to your needs
Installation, inspection and connection. We will handle the request with the distributor.
Installers are laying a photovoltaic panel on the roof of a detached house.

Who we install solar PV systems for

A house and a business have different consumption curves, connection methods and support schemes. That is why we do not handle them with a single package. Apartment buildings have an agenda of their own: sharing electricity between the flats and the changes to the sharing rules during 2026.

Photovoltaic panels on the tiled roof of a detached house

Detached house

Power plant 3 to 15 kWp with battery, optionally with water heating or preparation for a heat pump and electric vehicle. The design is based on the annual statement and when you are at home.

  • hybrid inverter and battery sized for evening consumption
  • connection application to ČEZ Distribuce, EG.D or PREdistribuce
  • Documents for the interest-free NZÚ 2026 loan and renovation passport
Solar PV power plant for a detached house
Rows of photovoltaic panels on the flat roof of a company hall

Company and operations

Workshop, warehouse, office, guesthouse or shop: daytime operations match best with solar power generation. We design based on 15-minute data from the electricity meter, not estimates.

  • PV plant up to 100 kWp for flat and pitched roofs, overflow regulation
  • assessment of the main circuit breaker, reserved power and roof statics
  • production and consumption monitoring, service supervision
Solar PV for businesses

Why consumption matters more than the number of panels

The roof produces the most at noon. Households consume in the morning and evening. Adjust the battery size and observe what happens to the surplus. The figures are indicative; we calculate the design for your home using real data.

Daily curve: roof generation and consumption

generation from the roofconsumptionstored and discharged from the battery

The model assumes a clear summer day and typical consumption profiles. The actual design is based on your bill and measurements.

What a turnkey power plant includes

From initial analysis to the connection protocol. We select components based on your roof and energy consumption, not on current stock availability.

Photovoltaic panels

Monocrystalline panels with a long manufacturer performance warranty, fixed to the structure according to the roof covering type. More about panels

Hybrid inverter

It manages generation, the battery and grid feed-in. We select based on the house's phases, circuit breaker capacity and plans for a heat pump or electric vehicle charging.

Battery storage system

Long-life LFP lithium cells, capacity tailored to evening consumption. What battery size

Water heating

Surpluses first to the boiler, then to the grid. The cheapest "battery" in the house. Photovoltaics for water heating

Grid connection

Application for micro-source connection with the distributor, contract, inspection and replacement of the electricity meter. We handle it for you.

Electrical installations and inspections

Distribution board modification, surge protection, inspection report. Installation carried out by a vetted team from your region.

Subsidies and financing

Documents for an interest-free NZÚ loan or an NZÚ Light grant, including a renovation passport. Conditions 2026

Monitoring and maintenance

Application for generation and consumption, inspection after the first year, service intervention if something is not right.

How the process works

Six steps from quotation to commissioning. We handle most of the administration; you just sign.

Consumption analysis

Send your annual energy statement and a few details about your property. We will provide an initial estimate of the solar plant size.

1 to 2 days

Technical inspection

We will survey the roof, assess the roofing material, shading, distribution board and supply connection. Free of charge.

within 2 weeks

Design and quotation

Panel layout, output, batteries, itemised breakdown and monthly production estimate.

within a week

Connection application

We submit the application to the distributor, monitor deadlines and prepare the documentation for NZÚ.

statement usually within a month

Installation

Structure, panels, inverter, battery, distribution board. Cleaning and training.

1 to 3 days

Inspection and commissioning

Inspection report, electricity meter replacement, connection protocol, monitoring via app.

according to the distributor

Detailed process including grid connection

What affects the price of photovoltaics

Catalogue sets have a single price for all roofs. A custom-built power plant has a price that matches your home. This determines it:

Size and composition

  • Installed capacity in kWp, i.e., the number and type of panels.
  • Battery capacity and whether the house is capable of operating during a grid outage.
  • Single-phase or three-phase inverter and its power output.
  • Add-ons: water heating, heat pump control, preparation for car charging.

Roof and house

  • Roofing and its condition: tiles, sheet metal, asbestos-cement or flat roofs require different anchoring.
  • Length of cable runs and condition of the distribution board, possible adjustment of the main circuit breaker.
  • Roof accessibility, scaffolding, building height.
  • Support from NZÚ, which reduces the final amount. Conditions 2026

You will receive an itemised offer with a monthly breakdown of estimated annual production and a clear indication of what is included in the price and what is not. No additional charges on site.

Want to work out whether it makes sense first? The solar PV calculator lets you set consumption, roof and battery, and shows annual generation and savings. If you already have a quote, enter its price and you get the payback.

Frequently Asked Questions

How many panels do I need for a detached house?

The design is based on consumption and the intended use of electricity in the home. A household with average consumption usually requires 10 to 16 panels, whereas a house with a heat pump or an electric vehicle needs more. The exact number is determined by analysing utility bills and surveying the roof, which is why we start there.

Are batteries worth it, or are panels enough?

Without a battery you will use only part of the generation directly, as the sun shines at midday while households consume in the morning and evening. A battery bridges this gap. From June 2026, storage is also a condition for support under Nová zelená úsporám. We design the ratio of panels to battery based on your consumption curve, not on a standard set.

How long does the process take from inquiry to commissioning?

The installation itself usually takes one to three days. The administrative process is longer: the utility network statement regarding the connection request typically arrives within a month, followed by an inspection and replacement of the electricity meter after installation. Overall, allow for several weeks to a few months depending on the distributor's workload in your region.

Do I need building permission?

Solar PV on the roof of a detached house up to 50 kW usually requires no building permit or notification, provided it does not affect the load-bearing structure and the property is not heritage-protected. We will verify any exceptions with the building authority for you before preparing the design.

What if the roof has poor orientation?

South is ideal, but east and west work very well, and spreading the panels on both sides often better matches household consumption throughout the day. North is not recommended. Flat roofs are handled with a tilted mounting structure. We will assess orientation and shading during the inspection.

What to do with surplus electricity that I don't consume?

Surpluses can be sold to an electricity trader or used via a so-called virtual battery, where the supplier credits excess feed-in against consumption. Terms vary depending on the supplier and contract. In our proposal, we will show you how much surplus is realistically generated and whether a physical battery is more cost-effective.

Send us your consumption data and we will return a proposal.

We only need your annual consumption from the bill and a few details about the roof. We will contact you within 24 hours, ask for further details and arrange a technical inspection. The design and inspection are free of charge and non-binding.

Thank you. We will contact you within 24 hours on working days to review your consumption and schedule an inspection appointment.
Sending failed. Please call us on 775 654 443 or write to us at info@fotovoltaika-na-miru.cz.

Prefer to call?

Call on working days; we will go through it together in ten minutes.

775 654 443

info@fotovoltaika-na-miru.cz

  • The design is based on your actual consumption, not a catalogue package.
  • Free technical inspection of the roof and distribution board.
  • We will handle the connection request with the distributor and prepare the documentation for the New Building Unit (NZÚ).