Fotovoltaika na míru / Companies
Daytime operations are ideal for photovoltaics: generation occurs precisely when machinery, cooling systems and offices consume power. We design based on real data from the electricity meter.
Production halls and workshops, warehouses and logistics centres, retail outlets and supermarkets, guesthouses and hotels, offices, agricultural buildings, residential blocks with shared consumption. They all share the fact that consumption occurs during daylight hours and the roof is available. It pays off most where cooling or air conditioning is in use: the highest summer afternoon demand coincides with peak generation.

Panel layout on the roof, installed capacity, estimated monthly annual generation versus your consumption, share of direct consumption, itemised breakdown of components and works, schedule and list of administrative steps including who signs what. For subsidy programmes for businesses (OP TAK, Modernisation Fund), we will verify open calls and prepare the technical part of the application. Programmes 2026
Service and operation. After commissioning, we monitor production via the monitoring system and carry out an inspection after the first year. Power plant inspections are repeated at intervals according to the facility's operating regulations; we keep track of the dates for you.
We design commercial power plants using 15-minute interval data from the electricity meter available to the distributor and based on the weekly operational schedule. The aim is to maximise direct consumption of generated power within the facility. We often limit grid feed-in for businesses because the buy-back price is low and the distributor may impose conditions on the connection.
The structural load from the panels ranges in tens of kilograms per square metre. For older halls and lightweight roofs, a statician assesses the load-bearing capacity and selects a light anchored structure instead of a ballasted one. This assessment is part of the preparation and not an additional item.
The connection application is submitted to the distributor along with the project documentation; the utility network statement usually arrives within a month. For higher output capacities, the distributor may require modifications to the connection or limitations on power feed-in. The entire process from enquiry to commissioning typically takes several months.
We only need your annual consumption and type of operation; we will request the fifteen-minute data ourselves. We will contact you within 24 hours on working days to arrange an inspection of the roof and the switchgear room.
Call on working days; we will go through it together in ten minutes.
775 654 443